Time and Work
SSC CGL • Tier-I Quant • Topic 11 of 18 • ~45 min padhne + ~30 min practice
Hindi mode me: questions pure Hindi me • notes & tricks Hinglish me (teacher voice)
Time and Work matlab: kaam baantne ka hisaab
Agar A ek kaam 10 din me karta hai, to 1 din me 1/10 kaam karega. B 15 din me kare to 1 din me 1/15. Dono milke 1 din me 1/10 + 1/15 = 1/6 kaam → poora kaam 6 din me. Bas itna hi hai poora chapter — 1-din-ka-kaam nikalo, jodo, ulta karo.
3 cheezein ready rakho
1. Fraction jodna-ghatana: 1/10 + 1/15 = (3+2)/30 = 5/30 = 1/6 — LCM nikalna aana chahiye.
2. Ratio ulta-seedha: Efficiency ∝ 1/Time — tez ka time kam, ye ulta rishta pakka karo.
3. Percentage se ratio: 50% zyada efficient = 3:2 efficiency = 2:3 time — aage kaam aayega.
SSC CGL me Time-Work se aksar 2–3 Qs aate hain
| Hot Type | Kya poochhte hain |
|---|---|
| Efficiency ratio | Tez-dheema, time ulta |
| Koi beech me chhode | A chhod ke gaya, bacha kaam |
| Pipe-cistern | Bharna-khaali, leak |
| Alternate days | Baari-baari, kaun shuru |
| Work and wages | Mazdoori efficiency me |
| 3 workers combined | LCM method |
| Men-days | Aadmi-din ka hisab |
Trend: Seedha "A+B milke" ab kam aata hai — twist wale (koi beech me chhoda, alternate days, pipe) zyada aate hain.
Sirf ye 3 cheezein karo
1. xy/(x+y) formula — do log milke kitne din (sabse zyada aane wala).
2. LCM method — 3 workers ya ajeeb numbers ho to kul kaam = LCM.
3. Pipe = +/- kaam — bharna plus, khaali minus. Bas sign ka khel hai.
10 second me batao
A 12 din me kaam karta hai → 1 din me 1/12 kaam.
B 8 din me → 1 din me 1/8 kaam.
Dono milke 1 din me → 1/12 + 1/8 = (2+3)/24 = 5/24 kaam.
Poora kaam → 24/5 = 4.8 din. Bas — yehi poora chapter hai, ab detail me chalte hain.
Kaam ka Basic Formula — 1-din-ka-kaam
Rule 1: Agar koi x din me poora kaam karta hai, to 1 din me 1/x kaam karega.
Rule 2: Agar 1 din me 1/x kaam hota hai, to poora kaam x din me hoga (ulta).
Rule 3 (milke): A ka 1/x + B ka 1/y = (x+y)/xy → milke xy/(x+y) din.
| Situation | Formula |
|---|---|
| A akela x din, 1-din-ka-kaam | 1/x |
| A (x din) + B (y din) milke | xy/(x+y) |
| A+B milke M din, A akela x din → B akela | 1/M − 1/x ka ulta |
A (12 din) + B (18 din) milke?
Step 1: A ka 1-din = 1/12, B ka 1-din = 1/18.
Step 2: Jodo: 1/12 + 1/18 = (3+2)/36 = 5/36.
Step 3: Ulta karo: 36/5 = 7.2 din = 7 din 4.8 ghante.
Shortcut se: (12×18)/(12+18) = 216/30 = 7.2 din ✓
Answer: 7.2 din (7 din lagbhag 5 ghante)
Efficiency — tez ka matlab kam time
Efficiency matlab 1 din me kitna kaam. Efficiency ∝ 1/Time — ye ulta rishta hai.
| Efficiency Ratio (A:B) | Time Ratio (A:B) | Matlab |
|---|---|---|
| 2 : 1 | 1 : 2 | A dugna tez → aadha time |
| 3 : 2 | 2 : 3 | Ulta kar do bas |
| 100% : 150% | 3 : 2 | 50% zyada = 3:2 eff |
Mazdoori rule: Paise efficiency ratio me batenge — time ratio me NAHI. Yehi sabse bada trap hai.
Kaam ka visual — din vs kaam
A tez hai (10 din), B dheema (15 din) — milke dono se tez (6 din).
"A 10 din, B 15 din → milke 25 din"
Galat! Milke kaam tez hota hai, dheema nahi. Sahi answer 6 din hai — dono ke alag-alag time se KAM.
Logic: 2 log kaam kar rahe hain to 1 aadmi se zyada kaam hoga roz — isliye din kam lagenge.
Rule: Milke ka time hamesha sabse tez worker ke time se bhi KAM hota hai.
Checkpoint 1
Q1. A 20 din me, B 30 din me kaam karta hai. Milke kitne din?
Milke = (20×30)/50 = 12 din। 50 din jodne walo — milke time GHATTA hai!
Q2. A, B se 3 guna tez hai. B 18 din leta hai to A kitne din lega?
Tez = kam time: 18/3 = 6 din।
Milke Kaam — 3 workers aur beech me chhodna
3 workers: 1/a + 1/b + 1/c jodo, ulta karo. Ya LCM method — kul kaam = LCM, efficiency baanto.
Koi beech me chhode: Pehle saath ka kaam nikalo (din × combined rate), bache kaam ko bache logon se karwao.
| Situation | Tareeka |
|---|---|
| A+B+C milke | 1/a+1/b+1/c ka ulta |
| x din saath, phir A gaya | Bache kaam = 1 − x×(combined rate) |
| Pairwise (A+B, B+C, C+A) | Teenon jodo, 2 se divide karo |
Nal aur Tanki — sign ka khel
Bharne wala nal = positive kaam (+1/x). Khaali karne wala = negative kaam (−1/y). Leak/chhed bhi negative hi hai.
| Nal | 1-ghante-ka-kaam |
|---|---|
| A bharta (x ghante) | +1/x |
| B khaali karta (y ghante) | −1/y |
| Dono khule | 1/x − 1/y |
Result positive → tanki bharegi. Negative → khaali hogi. Zero → level same rahega.
Nal 8 ghante me bharta, leak 12 ghante me khaali karta
Step 1: Nal = +1/8, Leak = −1/12.
Step 2: Net = 1/8 − 1/12 = (3−2)/24 = 1/24.
Step 3: Ulta karo = 24 ghante me bharegi.
Check: 24 ghante me nal 3 tanki bharega, leak 2 khaali karega → net 1 tanki ✓
Answer: 24 ghante
Time-Work me examiner ko do cheezein pasand hain: (1) "A 5 din kaam karke chala gaya" — bache kaam ka hisab; (2) Alternate days me kaun shuru karta hai — isme 1 din ka farak padta hai. Dono me jaldi karne wale fashte hain. Slow down, steps likho.
Time ratio ya Efficiency ratio?
| Poochha gaya | Kaunsa ratio | Example |
|---|---|---|
| Kaun kitne din me (time) | Time ratio (seedha) | A:B = 2:3 din |
| Kaun kitna tez (efficiency) | Efficiency ratio (ulta) | A:B = 3:2 tez |
| Mazdoori baantni hai | Efficiency ratio | 3:2 me paise |
Yaad rakho: Time aur efficiency ulte hain. Paise hamesha efficiency me bat-te hain.
Checkpoint 2
Q1. Nal A 6 ghante me bharta, nal B 8 ghante me khaali karta. Dono khule to?
Net = 1/6 − 1/8 = 1/24 → 24 ghante। 6+8=14 jodne walo — sign ka khel hai!
Q2. Kul mazdoori ₹900, A:B efficiency = 2:1. B ka hissa?
B = 900 × 1/3 = ₹300। Aadha-aadha nahi — ratio me baantna hai।
Galti #1: Time jod dena
"A 10 din, B 15 din → milke 25 din" — BILKUL GALAT.
Sahi: Milke = (10×15)/25 = 6 din.
Galti #2: Mazdoori time ratio me baantna — efficiency ratio me baantni hai.
Galti #3: Pipe wale me khaali karne wale ka minus sign bhoolna.
Kaam aur Mazdoori — paise ka hisaab
Rule: Mazdoori kiye gaye kaam ke hisab se bat-ti hai. Aur kiya gaya kaam efficiency ke hisab se hota hai.
Isliye: Mazdoori ∝ Efficiency (time se ulta!).
Example: A 10 din, B 15 din → eff ratio = 1/10 : 1/15 = 3:2 → ₹500 me se A = ₹300, B = ₹200.
Ulta sawal: "B ko ₹200 mile, ratio 3:2" → kul = 200 × 5/2 = ₹500.
Time and Work Test
Previous Year Questions 8 questions
Formula Sheet — Time and Work
| Topic | Formula |
|---|---|
| 1-din-ka-kaam | 1 ÷ kul din |
| A(x) + B(y) milke | xy/(x+y) |
| A+B+C milke | 1/(1/x+1/y+1/z) |
| Efficiency ratio | 1/Time ratio ka ulta |
| Mazdoori | Efficiency ratio me |
| Pipe net | Σ(±1/time) |
| Man-days | Men × Days = constant |
| Alternate | 2-din cycle, phir bacha kaam |
7 zaroori shabd
| Shabd | Matlab |
|---|---|
| Efficiency (kshamta) | 1 din me kitna kaam — tez hone ka maap |
| Man-days | 1 aadmi × 1 din ka kaam — kul kaam ki unit |
| Combined work | 2+ logon ka milke kiya kaam |
| Wages (mazdoori) | Kaam ke badle paise — efficiency me bat-te hain |
| Inlet pipe | Bharne wala nal (+ kaam) |
| Outlet/leak | Khaali karne wala (− kaam) |
| Alternate days | Baari-baari — ek din A, ek din B |
Time-Work se jude topics
Pipes & Cisterns — yehi Time-Work hai, bas nal-tanki ke roop me.
Time-Speed-Distance — wahan bhi "1-ghante-ka-kaam" jaisa "1-ghante-ki-doori" concept hai.
Partnership — paise lagane ka time bhi efficiency jaisa hi hisab hai.
